YD 5173-2015 数字蜂窝移动通信网WCDMA工程验收规范(英文版)
更新时间:2021-05-28 16:47:40
最新章节:4.2 Preliminary Acceptance Items封面
书名页
版权页
Foreword
Notes on Revision
1 General Provisions
2 Terms and Symbols
3 Pre-Acceptance Inspection
3.1 Equipment Room Inspection
- APP免费
3.2 Tower and Mast Inspection
- APP免费
3.3 Cable Conduit and Cable Tray Inspection
- APP免费
3.4 Equipment Installation Inspection
- APP免费
3.5 Antenna and Feeder Inspection
- APP免费
3.6 Cable Laying Inspection
- APP免费
3.7 Power Supply System and Monitoring System Inspection
- APP免费
4 Preliminary Acceptance
- APP免费
4.1 Preliminary Acceptance Testing Requirements
- APP免费
4.2 Preliminary Acceptance Items
- APP免费
5 Commissioning
- APP免费
5.1 Commissioning Requirements
- APP免费
5.2 Monitored Items During Commissioning
- APP免费
6 Final Acceptance
- APP免费
6.1 As-Built Technical Documents
- APP免费
6.2 Acceptance Requirements and Contents
- APP免费
Appendix A Explanation of Wording in This Code
- APP免费
Appendix B Tables of Work Completion Acceptance
- APP免费
Explanation of Provisions
- APP免费
3 Pre-Acceptance Inspection
- APP免费
3.4 Equipment Installation Inspection
- APP免费
3.5 Antenna and Feeder Inspection
- APP免费
3.6 Cable Laying Inspection
- APP免费
4 Preliminary Acceptance
- APP免费
4.2 Preliminary Acceptance Items
更新时间:2021-05-28 16:47:40